1.0 SHELL
54” Diameter x 20’-0” Long Shell
c/w Expansion Tank:
Ladder for access to expansion tank
2.0 COILS & FIRETUBE
COILS
PRE-HEAT - 4” Sch.160 SA-106B MAWP: 3375psig @ 200F
RE-HEAT - 4” Sch.160 SA-106B MAWP: 3375psig @ 200F
UTILITY (DIESEL) - 2” Sch.80 SA-106B MAWP: 675psig @ 200F
Coil registered in AB
FIRETUBE
1.5MMBTU/hr at Flux Rate 10,000 BTU/hr/ft2
1.0MMBTU/hr at Flux Rate 8,000 BTU/hr/ft2
3.0 FUEL GAS SCRUBBER
150 PSI MAWP SWEET FUEL GAS SCRUBBER
SA-106-B, 0.322 Thickness
-20/150°F Design Temperature
4.0 BURNER SYSTEM
Will be upgraded to ensure Burner is B149.3 compliant.
5.0 SKID AND BUILDING SPECIFICATION
SK-100 1 SKID BASE, 46’ x 16’ x 18” Skid
BH-400 1 BUILDING 27’ x 165”
6.0 NOTES, EXCEPTIONS & CLARIFICATIONS
- UT shall be done on firetube, coils and shell. Currently not completed.
- All dimensions and details specified in this quotation will need to be confirmed.
- Hydraulic valve control system shown in photos will not be included in package.
7.0 DELIVERY
Ready for shipping Two (2) to Three (3) Weeks. Delivery dependent on the current shop load. This schedule must be confirmed at time of award of contract.
Job Number | NRG 673 |
---|---|
BTU | 1.5 MM BTU |
A# | A535645 |
CRN | Alberta, T4263.2 |
Location | Halkirk |
Oilfield Process Equipment Solutions
SiteBuilderOne | Privacy Policy | Sitemap
©2022 NRG Process Solutions, All rights reserved.
NRG Process Solutions
300-3605-29 ST NE,
Calgary, AB T1Y 5W4
Phone: (403) 274-9660
Toll Free: 1-888-NRG-2442
Email: sales@nrgps.com